Target park area
Location
Opole, Poland
The property is equipped with the following technical infrastructure:
- electrical installation - 2 MW of electricity available
- water and sewage installation
- gas installation (LPG from 3x5,800 tank)
- maneuvering areas, roads, parkings
The property consists of the following buildings:
- Production hall with an area of 1,587.5 m2 with adpatations for crane - There is a possibility to leave the overhead crane.
- Production hall with an area of 563.1 m2
- Building of final production products with an area of 315.2 m2
- Social building (connected with the production hall) with an area 89 m2
- Office and social building with an area 198.5 m2
- Office building with an area 74 m2
- Warehouse building with an area 308 m2,
- Warehouse building for finished goods with an area of 297 m2
- Warehouse building with an area of 324 m2
- Weighing building with an area of 18.8 m2
According to the local zoning development plan, the property is dedicated for industrial purposes - the land is classified as "Ba".
Warehouse | Area | Grid (m) |
Clear height (m) |
Floor loading (t/m) |
Has sprinklers |
Has crossdock |
Has smoke flaps |
Has CCTV |
Has railway siding |
Has light production |
---|---|---|---|---|---|---|---|---|---|---|
Sorry, no records found |

Location:
Opole
Region:
Opole
-
Ewa Foryś
Consultant
-
+48 668 281 756
